JANUARY 26TH LOAD AND LEVEL THE KEEL MOLD

What a week!!!!   With the new timber in place, Chris and David started shaping and fairing,  Greg continued with the mast step and floor timbers.    New bronze bolts were cut and  threaded by the good people of Port Townsend Foundry and Ossian split his time with keel bolts and rudder pintle and gudgeons.

Annie worked at the shop for the final preparation of the keel mold.   More coats of water glass sealer and then constructing a shrink wrap cover to make sure it arrived dry.     Gus Sebastion of Olympic Boat Transport brought his trailer in on Thursday morning and they were off to Non-ferrous metals in Seattle.    What an amazing process!  

load and level keel mold 2.mov Watch on Posterous

Img_0499